Calhoun County Justice Center

Property Details: 192,000 sf Correctional Facility housing up to 630 inmates

Products Installed:

  • (2) Raypak XTherm Boilers (96% Efficient, 1,500 MBTU)
  • Thermal Process Control

Contractor: Hurst Mechanical 

Located in Battle Creek, Michigan, this 192,000 sf correctional facility experienced a complete failure of its two water heating units. The existing system was not energy efficient and the system control was unreliable. Performance Engineering Group designed a custom-made indirect system that is more robust and dependable. Two 96% efficient Raypak Xtherm 1,500 MBTU DHW Boilers and a TPC Control were installed. The facility now has a dependable indirect system with greater controllability and allows the existing equipment to remain as backup. 

We have worked with Performance Engineering Group going on 20 years now. Over the years, we have installed over 200 pieces of their equipment. They have been very easy to work with and have always given us great service. Mary Marble, Marble Mechanical Service, LLC