Calhoun County Justice Center

Property Details: 192,000 sf Correctional Facility housing up to 630 inmates

Products Installed:

  • (2) Raypak XTherm Boilers (96% Efficient, 1,500 MBTU)
  • Thermal Process Control

Contractor: Hurst Mechanical 

Located in Battle Creek, Michigan, this 192,000 sf correctional facility experienced a complete failure of its two water heating units. The existing system was not energy efficient and the system control was unreliable. Performance Engineering Group designed a custom-made indirect system that is more robust and dependable. Two 96% efficient Raypak Xtherm 1,500 MBTU DHW Boilers and a TPC Control were installed. The facility now has a dependable indirect system with greater controllability and allows the existing equipment to remain as backup.