Riverplace
Frankenmuth, Michigan |
| Partner: |
Performance Engineering Group, Inc. |
| Technical Sales Representative: |
Charlie Dashner |
| Installation Date: |
Summer 2005 |
| Equipment Installed: |
Raytherm H5-926 (qty 1) boiler and 4,900 square
feet of Thaw-Pak snowmelt system with tubing,
manifolds, boxes and snow controller. |
| Cause of Changeout: |
Added another snowmelt system to existing
development because 5 new shops were added. |
| Reasons Used PEG: |
Contractor has used PEG on 18 other snowmelt
systems at site all designed by PEG. Contractor
also likes engineering support and performance of system. |
| Unique Elements of Installation: |
Outdoor Boilers need to be hidden. Boilers near
roof overhang and behind fence. |