Home
About Us
Boilers
Water Heaters
Radiant Floor Heating
Snow Melting Systems
Thermostatic Mixing Valves
Showcase Jobs
Services
Newsletters
Links
Contact Us

Oakland Park Towers II
Troy, Michigan

Partner: Performance Engineering Group, Inc.
Technical Sales Representative: Alan Deal
Installation Date: September 2003
Equipment Installed:

Raypak Model H-2342 (qty 2) Hi Delta Boilers with Y3 Control.

Cause of Changeout:

Energy Upgrade

Reasons Used PEG:

Competitive Pricing and Good Engineering Backup.

Unique Elements of Installation: 25% reduction in consumption. Similar age and size building was done at the same time with competitor’s boilers and controls. Raypak building used 32% less energy in the following months even though the building was 10% larger.

Boiler

Water Heaters

Radiant Floor Heating

Snow Melting

Mixing Valves







32995 Industrial Road Phone: 734-266-5300
 Livonia, MI 48150  Fax: 734-266-5310

 
This website designed and maintained by IGD Solutions Corporation