Oakland Park Towers II
Troy, Michigan |
| Partner: |
Performance Engineering Group, Inc. |
| Technical Sales Representative: |
Alan Deal |
| Installation Date: |
September 2003 |
| Equipment Installed: |
Raypak Model H-2342 (qty 2) Hi Delta Boilers with
Y3 Control.
|
| Cause of Changeout: |
Energy Upgrade |
| Reasons Used PEG: |
Competitive Pricing and Good Engineering
Backup. |
| Unique Elements of Installation: |
25% reduction in consumption. Similar age and
size building was done at the same time with
competitor’s boilers and controls. Raypak
building used 32% less energy in the following
months even though the building was 10% larger. |