Brookhaven Manor
Ann Arbor, Michigan |
| Partner: |
Performance Engineering Group, Inc. |
| Technical Sales Representative: |
Alan Deal |
| Installation Date: |
October 2005 |
| Equipment Installed: |
H-992 (qty 2) boilers with Y-3 control, WH-652 (qty
1) Hi-Delta water heater and 350 Gallon Storage
Tank. |
| Cause of Changeout: |
Fear of failure of the storage tank. A single boiler
did all building heating and domestic hot water. |
| Reasons Used PEG: |
Fourmidable Group has done many projects with
PEG and likes the successes they have had. |