Home
About Us
Boilers
Water Heaters
Radiant Floor Heating
Snow Melting Systems
Thermostatic Mixing Valves
Showcase Jobs
Services
Newsletters
Links
Contact Us

Brookhaven Manor
Ann Arbor, Michigan

Partner: Performance Engineering Group, Inc.
Technical Sales Representative: Alan Deal
Installation Date: October 2005
Equipment Installed:

H-992 (qty 2) boilers with Y-3 control, WH-652 (qty 1) Hi-Delta water heater and 350 Gallon Storage Tank.

Cause of Changeout:

Fear of failure of the storage tank. A single boiler did all building heating and domestic hot water.

Reasons Used PEG:

Fourmidable Group has done many projects with PEG and likes the successes they have had.


Boiler

Water Heaters

Radiant Floor Heating

Snow Melting

Mixing Valves







32995 Industrial Road Phone: 734-266-5300
 Livonia, MI 48150  Fax: 734-266-5310

 
This website designed and maintained by IGD Solutions Corporation