Home
About Us
Boilers
Water Heaters
Radiant Floor Heating
Snow Melting Systems
Thermostatic Mixing Valves
Showcase Jobs
Services
Newsletters
Links
Contact Us

Royal Park Hotel
Rochester, Michigan

Partner: Performance Engineering Group, Inc.
Technical Sales Representative: Alan Deal
Installation Date: December 2003
Equipment Installed:

Raypak Model H-1802 (qty 2) with Y-3 control and H-1262 (qty 1) snow melting boiler with Tjernlund variable speed exhaust fan to vent all mechanical equipment.

Cause of Changeout:

New System

Reasons Used PEG:

PEG provided engineering support and design assistance and solved a $70,000 venting issue with a variable speed exhaust system.

Unique Aspects of the Installation:

Venting 9.0 million BTU’s in a single 16” diameter stack.


Boiler

Water Heaters

Radiant Floor Heating

Snow Melting

Mixing Valves







32995 Industrial Road Phone: 734-266-5300
 Livonia, MI 48150  Fax: 734-266-5310

 
This website designed and maintained by IGD Solutions Corporation