Cheboygan Medical Office Building
Cheboygan, Michigan |
| Partner: |
Performance Engineering Group, Inc. |
| Technical Sales Representative: |
Charlie Dashner |
| Installation Date: |
December 2004 |
| Equipment Installed: |
Raypak Model H-1083 (qty 1) |
| Cause of Changeout: |
New System |
| Reasons Used PEG: |
PEG provided engineering support, project design and system concept |
| Unique Elements of the Installation: |
System was designed to melt snow off of the roof of the building because a new building was build adjacent to the existing space. The additional snow load would exceed the capability of the roof structure. |