Samaratin Center
Detroit, Michigan |
| Partner: |
Performance Engineering Group, Inc. |
| Technical Sales Representative: |
Alan Deal |
| Installation Date: |
August 2004 |
| Equipment Installed: |
Raypak Model H3-4001(qty 3) w/ Y-3 Control |
| Cause of Changeout: |
Oversized for the load. Save energy and eliminate 5 full-time boiler operators |
| Reasons Used PEG: |
Proven energy savings and ability to run without a boiler operator present.
Anticipate savings to be in excess of $300,000 per year in labor and energy |
| Unique Elements of the Installation: |
Converted the entire building from steam to hot water. |