 |
Ford Field
Detroit, Michigan |
| Partner: |
Performance Engineering Group, Inc. |
| Technical Sales Representative: |
Alan Deal |
| Architect: |
Rossetti Associates, Smith Group |
| Mechanical Contractor: |
W. J. O’Neil Company |
| Installation Date: |
November 2001 |
| Raypak Model Installed: |
H6-1758 (4) Outdoor boilers |
| Unique Elements of the Installation: |
Melting accumulated snow in the 8’ wide x 8’ deep x 600’ long roof gutters. Boiler skids act as
reservoir to drain down the system. |