Home
About Us
Boilers
Water Heaters
Radiant Floor Heating
Snow Melting Systems
Thermostatic Mixing Valves
Showcase Jobs
Services
Newsletters
Links
Contact Us

Columbia Center
Troy, Michigan

Partner: Performance Engineering Group, Inc.
Technical Sales Representative: Alan Deal
Architect: Minoru Yamasaki Assoc/Gibbs Planning Group
Mechanical Contractor: Tempco Mechanical
Installation Date: May 2000
Raypak Model Installed: H9-1802
Unique Elements of the Installation: Replaced failed brick paver entrance with granite and added snowmelt at the same time. Heated areas include both tower entrances, sidewalks and traffic island.

Boiler

Water Heaters

Radiant Floor Heating

Snow Melting

Mixing Valves







32995 Industrial Road Phone: 734-266-5300
 Livonia, MI 48150  Fax: 734-266-5310

 
This website designed and maintained by IGD Solutions Corporation