Campus Martius Water Feature Detroit, Michigan |
| Partner: |
Performance Engineering Group, Inc. |
| Technical Sales Representative: |
Alan Deal |
| Installation Date: |
June 2004 |
| Equipment Installed: |
Raypak Model W9-2342 (qty 1), skid mounted boiler and heat exchanger system with controls |
| Cause of Changeout: |
New Application |
| Reasons Used PEG: |
Customer required a fully integrated skid mounted boiler, heat exchanger, and
control package |
| Unique Elements of the Installation: |
Installed an underground DHW boiler package to heat the fountain to 40ยบ F, and
heat the water for the zamboni machine in the winter |