Commercial Heating
 
 
 
 
 
 
 
 
 
 
 
 
Commercial Heating

 
Oakland Park Towers II
 
 
Royal Park Hotel
 
 
Truman High School
 

Details:

  • Troy, Michigan
  • Senior Housing – Hydronic Retrofit
  • Energy Upgrade
  • Two Raypak Hi Delta boilers installed
  • Gas boilers
 

Details:

  • Rochester, Michigan
  • Hydronic Heating, Snow Melting
  • Engineering Support and Design Assistance
 

Details:

  • Taylor, Michigan
  • Commercial Heating Boilers
  • Energy Efficiency Upgrade
  • Five Raypak Hi Delta boilers installed
  • Gas Boilers
 

Unique Element:

  • 25% reduction in consumption
 

Unique Element:

  • Solved a $70,000 venting issue with variable speed exhaust system
  • Venting 9.0 million BTUs in a single 16” diameter tack
 

Unique Element:

  • Old equipment inefficient and very oversized.
  • Installed 87% efficiency boilers
 
Return to Showcase Jobs
 
Newsletter  |  Training  |  Showcase Jobs  |  PEG News!